| Transit Drop-Operating |
| 4' (1.22 m); drop direct to concrete, 26 total drops: one drop to each face, edge and corner. Unit is operating and remains operational. Exceeds MIL-STD-810G, Method 516.6, Proc IV |
| 7') (2.13 m); drop direct to plywood over concrete, 26 total drops: one drop to each face, edge and corner. Unit is operating and remains operational. Exceeds MIL-STD-810G, Method 516.6, Proc IV |
|
| Minimum Integrity Vibration |
Minimum Integrity testing. Unit is not operating. MIL-STD-810G, Method 514.6, Procedure I: Figure 514.6 E-1, Category 24 |
| Vehicle Vibration |
Vehicle vibration testing. Unit is operating. MIL-STD-810G, US Highway Truck, Method 514.6, Procedure I: Figure 514.6 C-1 Category 4. Tablet W/Dock and Vehicle Kit |
| Temperature Extremes |
| Operating: -4° F to 140° F (-20° C to 60° C): Unit is operating. Cold boot within 15 min (power source) |
|
Non-Operating/Storage: -60° F to 160° F (-51° C to 71° C). Unit is not operating MIL-STD-810G, Methods 501.5, 502.5, Procedures I & II
|
|
| Thermal Shock |
-60° F to 160° F (-51° C to 71° C). MIL-STD-810G Method 503.5, Procedure II, cyclic: Unit is not operating |
| Blowing Rain |
4.0"/hr (101.6 mm/hr) of blowing rain with a 40-mph wind source for 30 minutes on each surface. Unit is operating. MIL-STD-810G, Method 506.5, Procedure I |
| Blowing Sand and Dust |
Blowing sand and dust at 30 mph for 30 minutes. Unit is operating. MIL-STD-810G, Method 510.5, Procedures I (Blowing Dust) and II (Blowing Sand) |
| Humidity |
3%-95% - non-non condensing humidity. Five 48-hour cycles. Unit is operating. MIL-STD-810G, Method 507.5, Procedure II |
| Salt Fog Spray |
5% saline exposure for 2 Cycles x 48 hrs. (24 hrs wet/24 hrs dry). Unit is not operating. MIL-STD-810G, Method 509.5, Procedure I
|
| Functional Shock |
40 g (peak), 11 ms, saw-tooth, 3 axis x 6 shocks = 18 shocks. Unit is not operating. 20g (peak) operating. MIL-STD-810G, Method 516.6, Procedure I
|
| Crash Shock |
75 g (peak), 11ms, saw tooth, 2+/- shocks x 3 axis = 6 shocks. Unit is not operating. MIL-STD-810G, Method 516.6, Procedure V |
| Altitude |
Chamber at 40,000 ft for 1 hour. Unit is operating. MIL-STD-810G, Method 500.5, Procedure II |
| Contamination by Fluids |
Detergents, brake fluid, aromatic hydrocarbons. Unit is not operating. MIL-STD-810G, Method 504.1 |
| Fungus |
28 days; US Fungus Types. No growth. Unit is not operating. MIL-STD-810G, Method 508.6, Procedure I |
| Solar Radiation |
Steady State A1. 1120 W/m2 (355 Btu/ft2/hr) UVB @ 50°C, 7 x 24-hr cycles. Unit is not operating. MIL-STD-810G, Method 505.5-2, Procedure II |